Table 15 Results of calculating the economic feasibility of the passive MDU according to the general MDU by year and the bid price rate

Division Unit General MDU to which the Standard for Energy-saving Design by year is applied
2001 2008 2011 2013
Annual saved amount of heating cost (A) KRW1000 1,282 1,035 670 457
Increased amount of construction cost in case of applying the design cost (B1) KRW1000 25,432 25,093 20,340 18,874
Increased amount of construction cost in case of applying the general qualification rate (B2) KRW1000 22,315 22,018 17,847 16,561
Increased amount of construction cost in case of applying the bottom bid price rate (B3) KRW1000 17,802 17,565 14,238 13,212
PB in case of applying the design cost (C1 = B1/A) year 19.8 24.2 30.4 41.3
PB in case of applying the general bid price rate (87.745%) (C2 = B2/A) year 17.4 21.3 26.6 36.2
PB in case of applying the bottom bid price rate (70%) (C3= B3/A) year 13.9 17.0 21.3 28.9